
| |
Re: Days for concrete to cure
Posted By: dmcguire In Response To: Days for concrete to cure (Julie)
Date: Wednesday, 10 May 2006, at 1:09 p.m.
: I am having my concrete pad poured this
: Thursday. The concrete contractor said that
: I could put the tub on it on Monday. Is this
: enough days for the concrete to cure, or is
: this standard? Thanks.Concrete reaches its design strength in 28 days if it is kept moist the entire time. Letting it dry out on top and the sides will decrease the total strengh.
After you pour the slab and it sets up, spray it down with a garden hose and keep it under a plastic sheet. Spray water under it as needed to keep it moist. If you can do this for the first 7 days you will increase the compessive strength a bunch.

| |
Hot Tub and Spa Cover message Board is maintained by Spa Cover administrator with WebBoard 5.12.
Roll Covers |
Insulating Spa Covers |
Aluminum Hot Tub Covers |
Soft-Top
Floating Spa Blankets |
Spa Cover Lifters |
Spa Covers Accessories
How to Measure for a New Spa Cover |
Cover & Spa Care Info |
Spa Cover Store
FAQ |
About/Contact |
Privacy Policy

Hot Tub & Spa Covers
Abracadabra Hot Tub & Spa Covers
A division of Roberts Hot Tubs
2343 Welcome Ave.
Richmond, CA 94804
(510) 234-7920